Services

Every trade we cover

Construction and mechanical work delivered with the takeoff, equipment plan and schedule documented up front. Scope, code, permit and inspection requirements vary by jurisdiction and get confirmed before work starts.

Structure & Envelope

Div 31 — Earthwork

Site Work & Excavation

Clearing, excavation, grading and stone base work that gets a site ready for concrete, utilities or a new structure.

  • /Clearing and stripping
  • /Excavation and backfill
  • /Rough and finish grading
  • /Stone base and compaction
  • /Erosion control and site protection
How it factors into an estimate →

Div 02 — Existing Conditions

Demolition

Selective interior demolition, removals and debris handling, done with dust control and protection of what stays.

  • /Selective interior demo
  • /Wall, ceiling and floor removals
  • /Fixture and equipment removals
  • /Dumpsters and debris haul-off
  • /Floor, door and finish protection
How it factors into an estimate →

Div 03 — Concrete

Concrete & Flatwork

Footings, slabs, flatwork, patching and housekeeping pads, including forming, reinforcing, placement and finishing.

  • /Footings and foundations
  • /Slabs on grade and toppings
  • /Sidewalks, pads and curbs
  • /Reinforcing steel and mesh
  • /Cutting, coring and patching
How it factors into an estimate →

Div 04 — Masonry

Masonry

Block, brick and stone work plus repointing and patching, with mortar, reinforcing and hoisting accounted for.

  • /CMU block walls
  • /Brick veneer and repair
  • /Repointing and patching
  • /Lintels and bond beams
  • /Mortar, grout and reinforcing
How it factors into an estimate →

Div 09 — Metal Framing

Metal Stud Framing

Light-gauge metal stud framing for commercial partitions, soffits, bulkheads and rated assemblies.

  • /Metal stud partitions
  • /Track, bracing and backing
  • /Soffits and bulkheads
  • /Rated assembly framing
  • /Door and window openings
How it factors into an estimate →

Div 06 — Wood & Plastics

Carpentry (Wood Framing & Finish)

Wood framing and finish carpentry — from studs, joists and sheathing to trim, doors, hardware and millwork installation.

  • /Wood wall, floor and roof framing
  • /Sheathing and blocking
  • /Doors, frames and hardware
  • /Base, casing and trim
  • /Millwork and casework install
How it factors into an estimate →

Div 07 — Thermal & Moisture

Roofing

Low-slope and steep-slope roof systems, flashings, edge metal and drainage details.

  • /TPO / EPDM membrane systems
  • /Shingle and metal roofing
  • /Insulation and cover board
  • /Flashing, curbs and edge metal
  • /Drains, scuppers and gutters
How it factors into an estimate →

Div 07 — Thermal & Moisture

Insulation & Air Sealing

Thermal and acoustic insulation with air sealing at walls, ceilings, decks and penetrations.

  • /Batt and mineral wool insulation
  • /Rigid board and sheathing insulation
  • /Spray foam and air sealing
  • /Acoustic wall and ceiling treatment
  • /Firestopping at penetrations
How it factors into an estimate →

Mechanical, Electrical & Plumbing

Div 23 — Air Distribution

Sheet Metal Fabrication

Fabricated ductwork, fittings, plenums and specialty metal for air distribution and kitchen exhaust.

  • /Rectangular and round duct
  • /Fittings, transitions and plenums
  • /Hangers, seals and insulation
  • /Kitchen hood exhaust duct
  • /Louvers, curbs and flashings
How it factors into an estimate →

Div 23 — HVAC

HVAC

Heating and cooling equipment, distribution, ventilation, controls and start-up balancing.

  • /Rooftop units, splits and heat pumps
  • /Supply, return and exhaust distribution
  • /Diffusers, grilles and registers
  • /Thermostats and controls
  • /Start-up, balancing and commissioning
How it factors into an estimate →

Div 23 — Refrigeration

Refrigeration

Commercial refrigeration — walk-ins, reach-ins, remote condensing units, line sets and controls.

  • /Walk-in coolers and freezers
  • /Remote condensing units
  • /Line sets and insulation
  • /Evaporators and defrost controls
  • /Charging, superheat and subcooling checks
How it factors into an estimate →

Div 22 — Plumbing

Plumbing

Domestic water, waste and vent piping, fixtures, water heaters and gas piping with required testing.

  • /Copper and PEX water piping
  • /Waste and vent piping
  • /Fixtures, carriers and trim
  • /Water heaters and pumps
  • /Gas piping and shut-offs
How it factors into an estimate →

Div 26 — Electrical

Electrical

Service, panels, branch circuits, devices, lighting and controls with grounding and load calculations.

  • /Panels, breakers and subfeeds
  • /Branch circuits, conduit and wire
  • /Devices, plates and boxes
  • /Lighting, emergency and exit fixtures
  • /Grounding, bonding and load calculations
How it factors into an estimate →

Div 21 — Fire Suppression

Fire Protection

Sprinkler mains, branch lines, heads and related fire alarm interface work.

  • /Mains, risers and branch lines
  • /Sprinkler heads and escutcheons
  • /Hangers, seismic bracing and sleeves
  • /Backflow and valve assemblies
  • /Hydraulic calculations and testing
How it factors into an estimate →

Finishes

Div 09 — Finishes

Drywall & Finish

Board hanging, taping and finishing to a stated level of finish, including corner bead and rated joints.

  • /5/8" Type X and standard board
  • /Tape, mud and sanding
  • /Corner bead and trims
  • /Rated and acoustic joint detail
  • /Patching and skim coats
How it factors into an estimate →

Div 09 — Finishes

Flooring & Tile

Floor prep and finish flooring — tile, LVT, resilient, carpet and coatings — including transitions and base.

  • /Substrate prep and leveling
  • /Tile, thinset and grout
  • /LVT, VCT and sheet goods
  • /Carpet and tile carpet
  • /Transitions, base and sealers
How it factors into an estimate →

Div 09 — Finishes

Painting & Coatings

Surface prep, priming and finish coatings for walls, ceilings, trim and metal.

  • /Prep, patching and masking
  • /Primer and sealer
  • /Wall and ceiling finish coats
  • /Trim, door and metal enamel
  • /Specialty and epoxy coatings
How it factors into an estimate →

Need a price on a job? Send the address, square footage and scope and we will return an itemized estimate.