Div 09 — Finishes
Flooring & Tile
Floor prep and finish flooring — tile, LVT, resilient, carpet and coatings — including transitions and base.
What this covers
- /Substrate prep and leveling
- /Tile, thinset and grout
- /LVT, VCT and sheet goods
- /Carpet and tile carpet
- /Transitions, base and sealers
How it factors into your estimate
- Material is taken from floor area with your waste factor applied for cuts and pattern layout.
- Leveling compound and prep are separate lines because existing slabs vary.
- Moisture testing on concrete slabs is required by most flooring warranties.
Labor intensity used by the estimator: 0.05 hours per square foot, adjusted for residential, commercial or industrial work. You can replace the hourly rate and every material price with your own numbers on the Trade Costs page.
Want a price for flooring & tile on your job? Send the address, square footage and scope.
Other trades